Free Virtual & Consultation

7,500 + 5 Star Reviews

Same-day Service

Live Operators 
24/7

7,500 + 5 Star Reviews

Free Virtual & Consultation

Same-day Service

Live Operators 
24/7

test new

300 South Tryon

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Location
Charlotte, NC
Location
Charlotte, NC
Location
Charlotte, NC
Location
Charlotte, NC
Location
Charlotte, NC

Project Summary

The Swing Space Annex temporarily houses approximately 1,250 legislative and executive elected officials and staff from the Capitol Annex until the new Annex project is completed. The building will then be jointly used as office space for legislative and executive employees. The 10-story building is approximately 472,600 gross square feet and includes function space for committee hearings, caucus meetings, general meeting rooms, and legislative and Executive Branch offices, as well as parking. The project was designed to be one of the most sustainable state office buildings to house elected officials in the country, with the goal of LEED Gold, and having achieved LEED Platinum. To meet that certification level, the building features low water use fixtures, a high-performance building facade, materials with high recycled content, day lighting, native vegetation on the surrounding site and terraces, as well as LED lighting throughout. Upon completion, the 10th & O Street building will be Zero Net Carbon and will also achieve Zero Net Energy through energy efficiency and offsite power generation.

 

Residential Condominium Apartments

Seattle, WA

Category
Commercial
Project Value
350K$
Year Completed
2024
Peak Manpower
8

Project Details

  • The Washington State Fire Training Academy is a firefighting training center near North Bend, Washington, United States. It is operated by the Washington State Patrol and includes classrooms, dormitories, and several simulation centers. The facility opened in 1984.
  • Embarking on a crucial mission to enhance safety and functionality, we are currently in the process of upgrading panels and implementing transformer grounding/bonding at the Fire Training Academy in North Bend, WA, which is on 51-acre site just east of North Bend. This project, initiated in November 2023, underscores our commitment to optimizing critical infrastructure for improved training environment.