Tacoma, WA

Buffalo Wild Wings – James Center

Gallery (1)

Project details

Our team successfully completed electrical work at the Buffalo Wild Wings located within the James Center in Tacoma, Washington. This project encompassed [Be specific here – based on your work, provide details like: the installation of new lighting fixtures, the upgrade of power outlets for kitchen equipment, the wiring for new point-of-sale systems, the installation of data cabling, any specific challenges overcome, etc.]. The work was executed efficiently and in accordance with all relevant electrical codes and safety standards, ensuring a functional and safe environment for both staff and patrons of this high-traffic restaurant location. Our expertise in commercial electrical installations allowed us to deliver a solution that meets the specific operational needs of a busy dining establishment.

Disciplines involved
  • Upgrade the Water Pump System
  • 100A, 480Y/277V 3-Ph, 4W, AIC 65kA@480V
  • 60A, 208V/120V, 3PH, 4W
  • 15 KVA, 480- 208/120, 3Ph
  • Grounding and bonding of electrical system
  • Install new devices and requirements
  • Install new protection and overload protection
  • Install new switches, breakers, contractors, and bottoms
  • hook up temp generator
Challenges

There was challenges in this project as the fire training academy they want to use the power for there mission and training while our electricians have to turn the power off for large areas, so we need to come out with solutions to provide them temp continence power for their building and training tower and internet while we are working.

SECTORS

OFFICES

Seattle, WA

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

Buffalo wild wings

Location
Tacoma, WA
Client
Port of Everett
General Contractor
TRICO Companies, LLC
Duration
9 Months
Budget
$350,000.00 USD
Size
6,000 SF
Project Completion
May 2024