Free Virtual & Consultation

7,500 + 5 Star Reviews

Same-day Service

Live Operators 
24/7

7,500 + 5 Star Reviews

Free Virtual & Consultation

Same-day Service

Live Operators 
24/7

Seattle, WA

Densmore Ave – Residential Condominium Apartments

Gallery (2)

Project details

The Washington State Fire Training Academy is a firefighting training center near North Bend, Washington, United States. It is operated by the Washington State Patrol and includes classrooms, dormitories, and several simulation centers. The facility opened in 1984.

Embarking on a crucial mission to enhance safety and functionality, we are currently in the process of upgrading panels and implementing transformer grounding/bonding at the Fire Training Academy in North Bend, WA, which is on 51-acre site just east of North Bend. This project, initiated in November 2023, underscores our commitment to optimizing critical infrastructure for improved training environment.

Disciplines involved
  • Upgrade the Water Pump System
  • 100A, 480Y/277V 3-Ph, 4W, AIC 65kA@480V
  • 60A, 208V/120V, 3PH, 4W
  • 15 KVA, 480- 208/120, 3Ph
  • Grounding and bonding of electrical system
  • Install new devices and requirements
  • Install new protection and overload protection
  • Install new switches, breakers, contractors, and bottoms
  • hook up temp generator
Challenges

There was challenges in this project as the fire training academy they want to use the power for there mission and training while our electricians have to turn the power off for large areas, so we need to come out with solutions to provide them temp continence power for their building and training tower and internet while we are working.

SECTORS

OFFICES

Seattle, WA

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

densmore ave

Location
Seattle, WA
Client
Densmore Ave
General Contractor
Densmore Ave
Duration
9 Months
Budget
$350,000.00 USD
Size
15,000 SF
Project Completion
Aug 2024