Project details

This project involved the supply, installation, and configuration of the Fluke 1735 Power Logger at a designated location to monitor and analyze the electrical power system. The primary objective was to capture accurate power data for load calculations and provide detailed insights into the system’s performance. The recorded data was then transferred to the design engineer for further analysis.

  • Supply and Installation: Provided and installed the Fluke 1735 Power Logger at the specified location.
  • Device Configuration: Configured the device with appropriate parameters to ensure accurate data capture.
  • Data Collection: Operated the power logger to collect necessary power data and perform load calculations as required.
  • Data Transfer and Handover: Extracted the stored data from the Fluke 1735 Power Logger and transferred it to the design engineer for further analysis of the electrical power system.
Disciplines involved
  • Installed the Fluke 1735 Power Logger with secure mounting and proper connections.
  • Configured the device with appropriate parameters for accurate power measurements.
  • Captured real-time power data, including voltage, current, and frequency.
  • Performed load calculations based on captured power data for system assessment.
  • Retrieved stored data from the Fluke 1735 Power Logger’s flash memory.
  • Delivered recorded power data to the design engineer for analysis.
  • Troubleshot any issues to ensure proper functionality of the device.
  • Ensured adherence to safety protocols and industry standards.
  • Provided ongoing technical support for device and data-related issues.
  • Collaborated with engineers to ensure data met analysis and optimization requirements.
Challenges

The project faced challenges such as ensuring secure installation and proper connections of the Fluke 1735 Power Logger in potentially cramped spaces. Configuring the device accurately for diverse system requirements and troubleshooting data retrieval issues added complexity. Additionally, adhering to strict safety protocols, providing ongoing technical support, and coordinating with engineers for precise data analysis further contributed to the project’s challenges.

SECTORS

OFFICES

ORANGE, CA

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

Buffalo wild wings

Location
Paramount, CA​
Client
Willdan Engineering
General Contractor
Willdan Engineering
Duration
3 Months
Budget
$350,000.00 USD
Size
4,000 SF
Project Completion
May 2024