Project details

This project involved the installation of electrical circuits for Johnjohn vaccine machines, including running conduits and wiring panels to ensure proper functionality. The work was carried out in a highly regulated environment, prioritizing safety and compliance with industry standards

  • Installation of electrical circuits to power Johnjohn vaccine machines.
  • Routing and securing of conduits for safe and efficient wiring.
  • Mounting and wiring of electrical panels to manage power distribution.
  • Conducted tests to verify the performance and safety of all connections.
  • Collaborated with the team to meet project deadlines and quality standards.
Disciplines involved
  • Install 3phase 200AMP Panel
  • Install 3Ph 30Amp Disconnect
  • Install 3Ph 20Amp Disconnect
  • Run EMT conduits ¾” – 2 ½”
  • Grounding & Bonding system
  • Retrofit EU. plugs to standard U.S receptacles.
  • Connect & hardwire laboratory machines
  • Install Air compressor 3hp – 5hp
  • Relocation/Rerun the curcuits for control IR equipment
  • Install special transformer to conver the voltages of the Machines
  • Replacing 20Amp temper resistant single outle
  • Replacing 30amp 125/250V Lock Receptacles Outlets
Challenges

The project involved challenges such as tight space constraints, requiring careful planning for efficient installation. Ensuring compliance with strict safety standards and coordinating with other teams for seamless integration were critical. Additionally, managing complex wiring layouts and meeting tight deadlines while troubleshooting issues required careful attention to detail

SECTORS

OFFICES

RIVERSIDE, CA

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

AP Technologies

Location
Irvine, CA
Client
Port of Everett
General Contractor
TRICO Companies, LLC
Duration
6 Months
Budget
$110,000.00 USD
Size
7,000 SF
Project Completion
Aug 2024