Free Virtual & Consultation
7,500 + 5 Star Reviews
Same-day Service
Live Operators
24/7
Free Virtual & Consultation
7,500 + 5 Star Reviews
Same-day Service
Live Operators
24/7
7,500 + 5 Star Reviews
Free Virtual & Consultation
Same-day Service
Live Operators
24/7
We take pride in showcasing our recent project at Embassy Suits on Nov, 29th 2023, suites hotel is near the junction of I-405 and I-90 in Bellevue, within 15 minutes of the Botanical Garden and Bellevue Square Mall. Seattle is 11 miles away, and Sea-Tac International Airport SEA is 17 miles. Washington, where we successfully replaced the E-sign board, new lighting system at the main lobby, setup a time clock for exterior lighting controls , adding a fresh and modern touch to the hotel’s exterior. Currently, our skilled team is in action, diligently working on enhancing the interior of the lobby area. This project reflects our commitment to delivering comprehensive solutions, transforming spaces for an elevated and welcoming guest experience.
Height and Accessibility: Working at a 60 ft height poses challenges in terms of accessibility and safety for the installation team, requiring specialised equipment and careful planning.Integration with Existing Infrastructure: Ensuring seamless integration of the new lighting system with the existing electrical infrastructure may present challenges, requiring thorough assessment and modification.Weather Conditions: Outdoor projects are susceptible to weather conditions, and adverse weather may impact the project schedule and the safety of the installation team.
Seattle, WA
Commercial Tenant Improvement (TI)
Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.
embassy suites by hilton