Free Virtual & Consultation

7,500 + 5 Star Reviews

Same-day Service

Live Operators 
24/7

7,500 + 5 Star Reviews

Free Virtual & Consultation

Same-day Service

Live Operators 
24/7

Garden Grove, Ca

Highsky investment LLc

Gallery (10)

Project details

Upgraded electrical feeders from aluminum to copper over a 200-foot span, serving 7 units with new subpanels installed in each. Installed 32 security cameras for full building surveillance. Added exterior lighting on all four sides to enhance safety and visibility. Project improved both electrical reliability and property security.

Scope of Work:

 

  • Replacement of ~200 ft aluminum feeders with copper conductors
  • Installation of new subpanels for 7 residential/commercial units
  • Setup of 32 surveillance cameras across the property
  • Exterior lighting installation on all four building sides
  • Service Type: Electrical & Low-Voltage Integration
Disciplines involved
  • Electrical Installation – Feeder upgrades, subpanel installations, and outdoor lighting
  • Low-Voltage Systems – Planning and installation of surveillance camera system
  • Project Management – Coordination of electrical and security scopes, scheduling, and client communication
  • Safety & Compliance – Ensured all work met local electrical and building codes
Challenges

This project required careful routing and replacement of feeders in an occupied building, minimizing disruption to tenants. Installing new subpanels in each unit involved precise coordination to manage limited access windows. The camera system installation had to ensure full building coverage while maintaining aesthetic considerations. Exterior lighting placement on all four sides also required strategic planning to balance brightness, coverage, and power load distribution.

SECTORS

OFFICES

California

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

Highsky investment LLC

Location
Garden Grove, Ca
Client
Highsky Investment LLC
Duration
3 Months
Budget
$85,000.00 USD
Size
6,000 SF
Project Completion
June 2025