Project details

The Port of Everett Marina is the largest public marina on the West Coast with 2,300 permanent boat slips and an additional 5,000 lineal feet of guest moorage. Our marina facilities offer an environmentally-compliant, full-service boat yard, a fuel dock, upland boat services and gear storage, laundry and shower facilities, and a 13-lane boat launch – the largest boat launch in Washington state – with ample and well-lit parking.

This project is to create a new shop building space for the Port of Everett’s Marina Maintenance Department by enclosing an existing covered canopy area at the north end of the PORT’s Waterfront Center. Work includes, but is not limited to, demolition, concrete foundations and slabs, steel framing, light gauge metal stud framing, CMU wainscoting, wall panels, windows, doors, overhead roll-up doors, landscaping, plumbing, mechanical / HVAC, and electrical work, all for a complete and operable project . 

Disciplines involved
  • Demolition the existing lights, power Receptical and lighting
  • (2) Main panels 200A 400V & 200A 120/208 V
  • (1) Transformer 400V/ 208V
  • Roof work main feeders
  • Interior and Exterior lighting
  • Install Main Switch gear
  • complete wiring and conduit installation
  • Data, fire Alarm and low Voltage
  • interior and Exterior Rough-in
  • complete trim out
Challenges

The biggest challenge on this project was demolition and installation of the new switchgear into an operating water plant. The key to this was to create temporary power for the plant while simultaneously coordinating connections to the new utility and generator.

OFFICES

Seattle, WA

SERVICES

Commercial Tenant Improvement (TI)

VALUE ADD

Durable marine-grade systems, energy-efficient lighting, smart power management, safety upgrades, and future-ready design — all boosting reliability, efficiency, and long-term savings.

Project summary

PORT OF EVERETT MARINA SHOP MAINTENANCE

Location
Everett, WA​
Client
Port of Everett
General Contractor
TRICO Companies, LLC
Duration
9 Months
Budget
$1.54M
Size
5,300 SF
Project Completion
May 2024